Datasheet
Tenon Forge v0.4
Sim-trained bin picking. Tenon Robotics SAS, Córdoba, Argentina · hola@tenonrobotics.com · build 0.4.118 · 2026-11
Function
Compiles cell CAD and SKU manifest into a randomized USD scene, trains a pick policy on GPU, gates it on held-out SKUs, exports a TensorRT engine to Jetson AGX Thor.
Performance (test cell, Oct 2026)
| Cycle time | 2.9–3.4 s at 2.1 kg |
|---|---|
| Held-out success | 91% mean over 400 SKUs |
| Range by family | 84–96%, 2 of 24 families in exception routing |
| Success definition | Lifted, transported and released inside the target bin without regrasp, 2 cm placement tolerance, three attempts maximum. |
| Throughput | 1,140 picks per hour gross at 3.1 s cycle. |
| Commissioning | 52 min median after gate pass, 6 of 24 cells |
| Exception rate | 2 per shift at the pilot customer, 93.4% on that family |
Interfaces
| Arms | UR10e, FANUC M-10iD, KUKA KR 10 R1100 |
|---|---|
| Grippers | Robotiq 2F-85, Schunk Co-act EGP, vacuum array |
| Fieldbus | PROFINET, EtherNet/IP |
| API | REST |
Compute
| Edge | Jetson AGX Thor, 60 W, 30 Hz |
|---|---|
| Runtime | TensorRT 10.7, INT8, per-gripper calibration |
| Training | Isaac Sim, Isaac Lab, Omniverse, 8×H100 80 GB, nvcr.io/nvidia/pytorch:26.08 |
| Planning | cuRobo replan, confidence threshold 0.6 |
Gates
≥88% held-out success · ≤3.5 s cycle · ≤45 N peak force. A policy that misses any gate does not deploy.
Documented limit
Film under 40 µm: 72% held-out, below the 88% gate. Mitigation: vacuum array.
Out of scope
Loose cable, parts under 8 mm, chrome above 300 lux, deformables above 3 kg, moving conveyors.
Commercial
| Pilot | US$ 4,500, one cell, three families, six weeks |
|---|---|
| Production | US$ 890 per cell per month, annual |
| New family | US$ 2,400, waived under 88% |
Internal measurements on the Córdoba test cell. Not a guarantee of performance on other manifests.
Gate report, build 0.4.118 (PDF) · Deployment report, cell 07 (PDF)